Programmable Transformer Rectifier for Railway Inverter Testing
A 300 kVA railway inverter test system with 900–1800 VDC programmable output, 230 kW continuous power, millisecond-scale solid-state supply interruption under full load, and SCADA-based supervision.

- Delivery year
- 2025
- Region
- Indonesia
- Application
- Post-assembly functional verification and selected type and routine testing of railway auxiliary inverters at production testing facilities.
In 2025, NSAD designed and delivered a 300 kVA programmable transformer-rectifier system for post-assembly verification and selected type and routine testing of railway auxiliary inverters. The system combines a 900–1800 VDC main output rated at 230 kW continuous, onboard battery-supply simulation, real-time control, and a SCADA system.
Engineering Challenge
Production testing requires repeatable high-voltage supply conditions, including controlled interruption and restoration. A key challenge was implementing programmable supply interruptions from a 10 ms minimum to several seconds under full-load conditions, with a required interruption-duration setting resolution of ≤1 ms. Conventional electromechanical switching methods, including high-speed circuit breakers (HSCBs), were evaluated but could not adequately meet the timing requirements of this application.
The test system therefore required a purpose-built supply-interruption subsystem integrated with the high-power source and control system.

NSAD Solution
NSAD implemented a multilevel, cascaded full-bridge rectifier with a programmable 900–1800 VDC main output rated at 230 kW continuous. A peak DC output of 250 kW was recorded during type testing.
To reproduce the short-duration disturbance, NSAD developed a solid-state supply-interruption subsystem in-house. The required 10 ms minimum interruption scenario was demonstrated during project testing. The hardware and firmware were designed with 100 µs switching-command timing resolution, finer than the specified ≤1 ms resolution requirement.

A separate programmable, regulated 66–154 VDC output rated at 2.2 kW simulates onboard battery-supply conditions. The NSAD MRCU-3U controller handles real-time control and monitoring at a 10 kHz sampling rate, while SCADA provides operator supervision and computerized logging. RS-485 and CANopen support integration with external test equipment.
Relevant test activities referenced IEC/EN 61287-1, JIS E 5008, JIS E 6402, EN 50163, and EN 50155.
Delivery and System Integration
The delivered installation includes a 10.9 × 1.5 × 2.4 m main power-panel assembly weighing approximately 12 tonnes, alongside a separate 1.3 × 1.0 × 1.6 m, 500 kg computerized operator panel equipped with casters. The project brought together high-power conversion, in-house-developed solid-state test technology, embedded control, and supervisory testing functions in one integrated system.
Technical Highlights
- Input system rating
- 300 kVA
- Programmable main DC output
- 900–1800 VDC (unregulated)
- Continuous main DC output power
- 230 kW
- Peak DC output recorded during type testing
- 250 kW
- Regulated battery-simulation output
- 66–154 VDC, 2.2 kW max
- Rectifier architecture
- Multilevel cascaded full bridge
- Minimum supply-interruption scenario
- 10 ms demonstrated
- Required interruption-duration setting resolution
- ≤1 ms (requirement)
- Implemented switching-control timing resolution for full-load operation
- 100 µs
- Real-time control and monitoring sampling rate
- 10 kHz
- Real-time control and monitoring channels
- Up to 20 channels at 10 kHz
- Embedded real-time controller
- NSAD MRCU-3U
- Remote monitoring interfaces
- RS-485 / CANopen